UEI JAMQGDTELS91 · CAGE 888Q3
Liberal Construction

Home / Services

Services

Six trades, one supply chain, one way of delivering

Each line can be delivered on its own or combined into a design-build package. The same project controls sit behind all of them: one project manager, three-phase quality control, an EM 385-1-1 safety program and a schedule the client can check.

At a glance

Clients
U.S. Navy and USACE (prime contracts)
Regions
Middle East and Africa
Contract types
Task orders, design-build, design-bid-build
Work type
Repair, renovation, upgrades and new construction
Codes
UFC, UFGS, IBC, NFPA, EM 385-1-1
01

Mechanical, HVAC & Plumbing

Trade

Air handling, cooling and plumbing in buildings that stay occupied while we work. We plan shutdowns around the mission, replace and upgrade equipment, rebalance the systems and hand over with test reports and trained operators.

  • Air handling unit and HVAC equipment replacement
  • Ductwork, distribution and controls
  • Plumbing and domestic water
  • Dry-to-wet conversion of modular living units
  • Testing, adjusting and balancing
  • Operation and maintenance manuals and training

Recent workHVAC, fire protection and electrical improvements; dry-to-wet conversion of modular living units.

ASHRAEUFC 3-401-01UFC 3-420-01UFGS
02

Fire Protection & Alarm

Trade

Life-safety systems that have to work the first time: detection, notification and suppression, connected to base emergency dispatch where the installation requires it, and accepted only after witnessed tests.

  • Fire alarm system upgrades and replacement
  • Connection of building alarms to base dispatch
  • Sprinkler and fire protection improvements
  • Work across multiple occupied buildings
  • Acceptance tests witnessed by the client
  • As-built drawings and test certificates

Recent workFire alarm upgrades across multiple buildings; fire protection improvements.

NFPA 72NFPA 13UFC 3-600-01
03

Electrical Systems

Trade

Power distribution inside and around the facilities we build and upgrade, installed and tested to U.S. codes and energized with the client.

  • Distribution equipment, panelboards and feeders
  • Lighting and power for new and renovated spaces
  • Grounding and bonding
  • Electrical work for HVAC and fire alarm upgrades
  • Testing and energization
  • Arc-flash labels and as-built drawings

Recent workElectrical improvements; electrical systems for a new facility.

NFPA 70 (NEC)NFPA 70EIEEEUFC 3-501-01
04

Repair, Renovation & Roofing

Trade

Repair and renovation of occupied facilities, phased so the mission keeps running: roofs, building envelopes, interiors and building upgrades, with access, noise and security planned with the installation.

  • Roof repair and replacement
  • Building upgrades and envelope repair
  • Interior renovation and finishes
  • Minor improvements by task order
  • Phased work in occupied buildings
  • Temporary protection, dust control and cleanup

Recent workRoof repair and replacement; minor improvements; improvements to a multi-story building.

IBCUFC 1-200-01UFC 3-110-03ASTM
05

New Construction & Modular

Trade

New facilities on operating installations, and modular living and working units: foundations, placement, utility connections, fit-out and commissioning, coordinated with base operations.

  • New single-story facilities and complexes
  • Work inside active, secured installations
  • Modular living unit placement and conversion
  • Foundations and site utilities
  • Fit-out, furniture and equipment installation
  • Commissioning and handover

Recent workA new facility complex; dry-to-wet conversion of containerized living units.

UFC 1-200-01UFC 4-010-01IBC
06

Waterfront & Marine Structures

Trade

Repair and maintenance of floating and fixed marine structures, planned around port operations and the weather, with marine safety measures built into the work plan.

  • Floating structure repair and maintenance
  • Floating and fixed marine components
  • Marine subcontractors, prequalified and supervised
  • Work planned around port operations
  • Marine safety and environmental controls
  • Inspection reports and as-built records

Recent workRepair and maintenance of a floating marine structure.

EM 385-1-1UFGS
07

Procurement & Logistics

Service

Getting the right equipment to a secure site on time. Long-lead items are identified at the start, approved through submittals, then shipped, cleared through customs and delivered through base access.

  • Requests for quotation to prequalified suppliers
  • Submittals approved before purchase
  • Long-lead tracking against the schedule
  • Freight, customs clearance and base delivery
  • Receiving inspection and storage
  • Supplier and subcontractor records for closeout
FARDFARSUFGS 01 33 00
08

Design-Build Delivery

Delivery model

One contract for design and construction. A designer of record works under our contract; we carry the design, the build and the interface between them, so the client has one point of accountability from basis of design to final acceptance.

  • Basis of design and design analysis
  • Design quality control before every submittal
  • Staged design submittals and client reviews
  • Comment resolution on record
  • Construction to the approved design
  • As-built drawings and record documents

How it fitsOur task orders have included design-build and build-only work; we staff both.

UFC 1-200-01UFGS 01 33 16UFGS 01 45 00
Next step

Have a requirement or a teaming question?