How we deliver

One process, every project

From a single task order to a multi-discipline design-build project, the same phases, controls and records apply. This is what working with us looks like from the contracting officer's side of the table.

On every project

Lead
One accountable project manager
Quality
Quality control plan, three-phase inspections
Safety
EM 385-1-1 accident prevention plan
Schedule
CPM baseline and three-week look-aheads
Records
Controlled project library and registers
Delivery models

How we are engaged

The contract type changes what we are responsible for. It does not change the controls behind the work.

01

Task orders

Task orders under multiple-award construction contracts: competed among prequalified contractors, priced quickly and delivered with the same controls every time.

02

Design-build

One contract for design and construction. A designer of record works under our contract and we carry the interface between design and build.

03

Design-bid-build

The government's design, built by us: submittals, requests for information and changes managed against the issued drawings and specifications.

04

Sustainment and modernization

Repair, replacement and upgrades in occupied, operating facilities, phased around the mission and the installation's access rules.

Project lifecycle

Six phases, each with its own deliverables

A phase is finished when its deliverables are complete and accepted, not when the calendar says so.

  1. Tender & estimate

    • Solicitation and scope review
    • Site visit and questions
    • Quantity take-off
    • Supplier and subcontractor quotes
    • Bid decision
    • Technical and price proposals
  2. Design

    • Designer of record on contract
    • Basis of design
    • Design quality control
    • Staged design submittals
    • Comment resolution on record
    • Design-build projects
  3. Plan & mobilize

    • Accident prevention plan
    • Quality control plan
    • Baseline CPM schedule
    • Submittal register
    • Base access and badging
    • Site setup
  4. Procure

    • Requests for quotation
    • Bid comparison and award approval
    • Subcontracts with flowdowns
    • Submittals before purchase
    • Long-lead tracking
    • Shipping and customs
  5. Build & control

    • Three-phase inspections
    • Activity hazard analyses
    • Daily quality and safety reports
    • Three-week look-aheads
    • Progress and payment
    • Change control
  6. Commission & close out

    • Testing and commissioning
    • Operator training
    • Operation and maintenance manuals
    • As-built drawings
    • Warranties
    • Final acceptance and closeout
Management disciplines

Eight disciplines decide whether a project finishes clean

On time, to budget and without dispute. Each one has an owner on the project and a record behind it.

SCHEDULE

Planning & scheduling

  • CPM baseline, resource-loaded where required
  • Updates with each payment request
  • Three-week look-aheads
  • Early warning of delay, with a recovery plan
COST

Cost, payment & changes

  • Cost codes for every project
  • Monthly forecast to completion
  • Payment requests under the contract's terms
  • Change and modification pricing on record
SUPPLY

Procurement & subcontracts

  • Prequalified suppliers and subcontractors
  • Competitive quotes and written award approval
  • Flowdown clauses in every subcontract
  • Insurance and bond checks
QUALITY

Quality control

  • Quality control plan and manager
  • Preparatory, initial and follow-up phases
  • Submittal register and test reports
  • Deficiencies tracked to closure

Our quality program

SAFETY

Safety & health

  • EM 385-1-1 accident prevention plan
  • Activity hazard analyses before work starts
  • Daily inspections and toolbox talks
  • Incident reporting and stop-work authority

Our safety program

DESIGN

Design management

  • Designer of record coordination
  • Design quality control before submittal
  • Comment resolution records
  • Drawing revision control
RECORDS

Document control

  • One controlled library per project
  • Project code on every record
  • Registers for submittals, RFIs and correspondence
  • Approvals kept on record
CONTRACT

Contracts & compliance

  • Notices and modifications on time
  • FAR and DFARS flowdowns
  • Defense Base Act insurance
  • Records kept for the required retention
Cybersecurity

How we protect your information

CMMC Level 2 (Self) status posted in SPRS. Controlled information stays in a dedicated, access-controlled environment.

Our public website, its contact form and our careers pages are not for controlled information: please do not send it through them.

AssessmentCMMC Level 2 (Self)
Where postedSupplier Performance Risk System (SPRS)
StandardNIST SP 800-171
Codes and standards

We build to U.S. federal criteria

UFCUFGSIBCEM 385-1-1NFPA 70 (NEC)NFPA 70ENFPA 72NFPA 13IEEEASHRAEASTMACIOSHA 29 CFR 1926FARDFARS
Tools

The systems the work runs on

Primavera P6AutoCADMicrosoft 365 and SharePointGovernment systems the contract names (eCMS, RMS/QCS)