UEI JAMQGDTELS91 · CAGE 888Q3
Liberal Construction

Home / How we deliver / Safety and health

Safety and health

Safety is planned before the work starts

Every project runs under an accident prevention plan written to USACE EM 385-1-1, the safety requirements manual for U.S. military construction, with a site safety and health officer on site whenever work is under way. Hazards are analyzed before each activity starts, and anyone on site can stop work that is not safe.

Safety at a glance

Standards
USACE EM 385-1-1 and OSHA 29 CFR 1926
Plan
Accident prevention plan, accepted before work starts
On site
Site safety and health officer
Each activity
Activity hazard analysis, briefed to the crew
Everyone
Authority to stop unsafe work
Record
No lost-time accidents on our projects
From plan to daily work

Six layers of control between a hazard and a crew

Each layer has an owner and a record, and the record is checked before the work moves on.

  1. Accident prevention plan

    Written for the project and accepted by the government before work starts, with the site-specific plans the work needs.

  2. Activity hazard analyses

    One for each definable feature of work, briefed to the crew before that work starts and updated when conditions change.

  3. Orientation and training

    Site orientation for every worker, toolbox talks, and competent persons named for the work that requires them.

  4. Permits and lift plans

    Hot work, confined space, excavation, energized work and crane lifts planned and permitted before work begins.

  5. Daily inspections

    Inspections and a daily safety report by the site safety and health officer, with deficiencies tracked to correction.

  6. Incidents and near misses

    Reported at once, investigated for cause and shared, so the lesson reaches the next crew.

Who does what

Safety has an owner at every level

Named in the accident prevention plan and briefed to every crew.

SSHO

Site safety and health officer

On site whenever work is under way and trained to the level EM 385-1-1 requires; inspects daily and records the findings in the daily safety report.

LEAD

Project manager

Owns the accident prevention plan, gives it the people and time it needs and reviews safety performance with the client.

PARTNERS

Subcontractors

Work under our accident prevention plan, attend site orientation and write activity hazard analyses for their own work, reviewed by our site safety and health officer.

EVERYONE

Every worker

Authority to stop work that is not safe, without blame, and a duty to report hazards and near misses.

Working overseas

Safety for remote, hot and access-controlled sites

Our sites are on U.S. installations in the Middle East and Africa, where summer heat, long supply lines and base rules shape the safety plan. The plan covers them before the crew arrives.

  • Heat stress plans for summer work: water, shade, rest and work-rest cycles
  • Medical and emergency plans tied to the installation's response
  • Base access, escort and security rules briefed at orientation
  • Briefings in the languages the crew understands
  • Defense Base Act insurance for our overseas workforce
Next step

See how we control quality