Quality control

Quality built in, then inspected in three phases

Every project runs under a contractor quality control plan written to the contract's quality specification, UFGS 01 45 00 on most NAVFAC and USACE work, and led by a quality control manager on site. Each definable feature of work passes three phases of control, and the records are kept as the work is done, so closeout is ready when the work is.

Quality at a glance

Standard
UFGS 01 45 00, or the contract's quality specification
Lead
Quality control manager on site
Training
Construction Quality Management for Contractors (CQM-C)
Method
Preparatory, initial and follow-up phases
Records
Daily quality control reports
Three-phase control

Every definable feature of work, controlled three times

A definable feature of work is a task that is separate from other tasks and has its own control requirements, such as a roof, a fire alarm system or a concrete pour.

  1. Preparatory phase

    Before the work starts: plans, specifications and approved submittals reviewed, materials checked against them, tests arranged and the crew briefed. The government is told in advance and invited.

  2. Initial phase

    When the work begins: the first work is inspected against the contract, workmanship is agreed and the standard is set for the rest of the feature.

  3. Follow-up phase

    Every day until the feature is complete: work checked against that standard, and deficiencies recorded and corrected before they are covered up.

Who does what

Quality has an owner on every project

Each role is named in the quality control plan, which the government accepts before work starts.

QC MANAGER

Quality control manager

Runs the quality control plan, leads each phase, signs the daily quality control report and has written authority to stop work that does not meet the contract.

SPECIALISTS

Specialists and testing

Qualified specialists and testing laboratories where the specification calls for them, from materials testing to fire protection and electrical acceptance tests.

SUBCONTRACTORS

Every firm on site

Subcontractors work under our quality control plan: their submittals go through our review and their work passes the same three phases.

DESIGN

Design quality control

On design-build projects, the designer of record checks every design submittal before it goes to the client, and each review comment is resolved on record.

Records

Records kept with the work, not rebuilt at the end

Quality records are kept current as the work is done, in the government system the contract names, such as RMS/QCS or eCMS, and in our controlled project library. The closeout package comes together as the work finishes, not months after it.

  • Daily quality control reports
  • Submittal register
  • Test and inspection reports
  • Rework items list
  • Requests for information
  • Punch lists
  • As-built drawings
  • Operation and maintenance manuals
  • Warranties
  • Training records